|
|
Green Energy |
|
- 600KW SV52 SUZLON Windmill commissioned in March 2012
- 4 Nos - 800 KW ENERCON Windmill
- 45% of AAIPL's annual energy requirement is sufficed by Non-conventional energy
|
|
|
|
|
|
Green Belt |
|
As a measure to prevent global warming and to reduce pollution, green belt development is done in and around the factory. |
|
|
|
|
|
Ground Water Conservation System |
|
In AAIPL, we do rain water harvesting for accumulation and deposition of rainwater for reuse on-site. |
|
|
|
|
|
Labour Accommodation |
|
|
- A well-equipped staff/labour housing with 52 rooms, in an area of 1 Acre land with all basic amenities, is provided for staffs and workers at free of cost
- Special bus services are provided on weekly basis for those who are staying in the housing units for their personal needs
- Indoor and Outdoor games are available for personnel to ease work stress / pressure
|
|
|
|
|
|
Dry Cooling Tower |
|
|
Having high concern on water resources, without considering the huge initial investments, the induction furnaces' cooling coils are connected to dry cooling towers, in closed loop, there-by reducing the water evaporation loses. |
|
|
|
|
|
Fume and Dust Extraction Systems |
|
|
AAIPL has always been keen on having a better environment for future. So the following systems are incorporated to control pollution
- Fume extraction systems for all the induction furnaces
- Dust extraction systems for sand plants and shot blasting machines
- Multi cyclone dust extraction systems for bench grinders in the fettling shop
|
|
|
|
|